Most people are unaware of the complexities of concrete storm drain construction. Contractors employed in this specialty niche perform all facets of work associated with drainage systems used to eradicate storm water from residential and city streets.
There are multiple phases of concrete storm drain construction. Project owners recruit civil engineers to create blueprints. Engineers work with land surveyors and subsurface utility engineering contractors to acquire information about the construction site.
After blueprints are created, teams of workers are needed to excavate the site, dig trenches, and install pipes. Once systems are installed and tested for structural integrity, laborers restore the land to its original condition.
From start to finish, the process must be carefully orchestrated to ensure all system components work at full capacity.
The objective of drainage systems is to provide an outlet for excess waterfall to prevent flooding. As storm water rolls off rooftops, streets, and surface areas it is pulled toward street gutters or curb inlets and pushed into a catch basin. From there it travels through a series of underground pipes which lead to the nearest body of water.
Municipal storm drains have a minor and major system which are used independently or together to most effectively manage water flow. Other important components are swales, concrete pipes, and storm drains.
Installing water pipes is an exhaustive process that consists of clearing and grading the construction site and excavating trenches. Pipe segments and storm water drainage tanks are trucked in and installed on site. Once the system is installed it is put through several tests to make certain all elements are structurally sound.
Retention or detention ponds have to be built whenever municipal systems are placed in areas that aren't close to bodies of water. These man-made storage facilities can retain storm water until it can be safely released or transported to another location.
An unfortunate side effect of drainage systems is they are a major cause of water pollution. Even though all systems that discharge pollutants into waterways are monitored by the Environmental Protection Agency, high levels of toxic waste is deposited into oceans, rivers, and streams every day.
On the flip side, the majority of municipal storm drainage systems are fitted with oil and water separators to lower the level of synthetic oils released into eco systems. Although this device is effective with oil, it has no effect on other sorts of harmful contaminants allowed to pass through concrete catch basins.
The way that storm drains work makes it impractical to use filtration screens or purification devices. Water needs to be ushered into catch basins and subsurface pipes as quickly as possible. Filtration systems would impede water flow and slow down the process, which in turn would result in flooding.
Storm drain construction contractors must abide by local and national water management practices any time they install, fix, or remove system components. Because of the difficulties associated with this type of construction it is vital to hire respected contractors that have experience in the type of project involved.
Learn more about the pipeline construction industry from the experts at Kana Pipeline. Located in southern California, Kana has performed concrete storm drain construction for nearly 30 years. We possess practical experience and knowledge that help keep projects on time and within budget. Visit us online at http://www.kanapipeline.com.
Article Source: http://EzineArticles.com/?expert=Daniel_Locke
Article Source: http://EzineArticles.com/7256356
No comments:
Post a Comment